Meter technology

With the counting technology available in the eibabo online shop, you always have a wide range of consumption and times of power consumption in view. With an operating hours counter, you can measure how long a machine or an entire system has been running since it was commissioned. An electricity meter measures the electricity consumed by a machine or an entire household within a certain period of time. These devices can be configured very differently and, in addition to classic alternating current, also include three-phase current or direct current, depending on the model. A maximum monitor always keeps an eye on the current consumption of a system and compares this with a previously set maximum target consumption. If necessary, it switches off electrical consumers so that the maximum target consumption is not exceeded.

 
With the counting technology available in the eibabo online shop, you always have a wide range of consumption and times of power consumption in view. With an operating hours counter, you can... read more »
Close window
Meter technology
With the counting technology available in the eibabo online shop, you always have a wide range of consumption and times of power consumption in view. With an operating hours counter, you can measure how long a machine or an entire system has been running since it was commissioned. An electricity meter measures the electricity consumed by a machine or an entire household within a certain period of time. These devices can be configured very differently and, in addition to classic alternating current, also include three-phase current or direct current, depending on the model. A maximum monitor always keeps an eye on the current consumption of a system and compares this with a previously set maximum target consumption. If necessary, it switches off electrical consumers so that the maximum target consumption is not exceeded.
Close filters
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
from to

2 From 37
No results were found for the filter!
RECOMMENDED
3D
Eltako - DSZ15DM-3x80A MID - Three-phase meter M-Bus - Direct kilowatt-hour meter 10A DSZ15DM-3x80A MID
17,880.34₹ excl. VAT

*

plus shipping
(22,844.92₹ RRP***)
Three-phase meter M-Bus - Direct kilowatt-hour meter 10A
Eltako
| DSZ15DM-3x80A MID
RECOMMENDED
3D
ABB - B24 352-100 - Transformer kilowatt-hour meter 1A B24 352-100
19,830.17₹ excl. VAT

*

plus shipping
(38,996.66₹ RRP***)
Transformer kilowatt-hour meter 1A
ABB
| B24 352-100
RECOMMENDED
3D
ABB - B23 212-100 - Three-phase meter direct connection. 65A - Direct kilowatt-hour meter 5A B23 212-100
16,249.23₹ excl. VAT

*

plus shipping
(30,091.17₹ RRP***)
Three-phase meter direct connection. 65A - Direct kilowatt-hour meter 5A
ABB
| B23 212-100
RECOMMENDED
3D
Eltako - DSZ15DE-3x80A - Three-phase meter - Direct kilowatt-hour meter 10A DSZ15DE-3x80A
7,539.67₹ excl. VAT

*

plus shipping
(10,874.07₹ RRP***)
Three-phase meter - Direct kilowatt-hour meter 10A
Eltako
| DSZ15DE-3x80A
RECOMMENDED
3D
Eltako - DSZ14DRS-3x80A MID - Three-phase meter RS485 bus radio - Direct kilowatt-hour meter 10A DSZ14DRS-3x80A MID
14,709.99₹ excl. VAT

*

plus shipping
(18,795.26₹ RRP***)
Three-phase meter RS485 bus radio - Direct kilowatt-hour meter 10A
Eltako
| DSZ14DRS-3x80A MID
RECOMMENDED
3D
Eltako - WSZ15D-32A MID - AC meter MID, 32A - Direct kilowatt-hour meter 5A WSZ15D-32A MID
4,353.38₹ excl. VAT

*

plus shipping
(6,280.71₹ RRP***)
AC meter MID, 32A - Direct kilowatt-hour meter 5A
Eltako
| WSZ15D-32A MID
RECOMMENDED
3D
RECOMMENDED
3D
Siemens - 7KM2200-2EA40-1EA1 - Gauge 65A - Multifunction measuring instrument 7KM2200-2EA40-1EA1
20,548.24₹ excl. VAT

*

plus shipping
(24,185.43₹ RRP***)
Gauge 65A - Multifunction measuring instrument
Siemens
| 7KM2200-2EA40-1EA1
RECOMMENDED
3D
Hager - ECN140D - Energy meter 1-phase direct 40A, 1M - Direct kilowatt-hour meter 40A ECN140D
5,291.73₹ excl. VAT

*

plus shipping
(9,908.53₹ RRP***)
Energy meter 1-phase direct 40A, 1M - Direct kilowatt-hour meter 40A
Hager
| ECN140D
RECOMMENDED
3D
ABB - 2CMA103575R1000 - Three-phase meter C13 110-301 - Direct kilowatt-hour meter 40A 2CMA103575R1000
8,099.31₹ excl. VAT

*

plus shipping
(14,998.71₹ RRP***)
Three-phase meter C13 110-301 - Direct kilowatt-hour meter 40A
ABB
| 2CMA103575R1000
RECOMMENDED
3D
Schneider Electric - R9M70 - PowerTag F63 3P+N - Direct kilowatt-hour meter 63A R9M70
7,063.46₹ excl. VAT

*

plus shipping
(14,014.42₹ RRP***)
PowerTag F63 3P+N - Direct kilowatt-hour meter 63A
Schneider Electric
| R9M70
RECOMMENDED
3D
ABB - B23 111-100 - Three-phase meter - Direct kilowatt-hour meter 5A B23 111-100
12,351.44₹ excl. VAT

*

plus shipping
(22,873.04₹ RRP***)
Three-phase meter - Direct kilowatt-hour meter 5A
ABB
| B23 111-100
2 From 37
Viewed from you