Parapet duct UT - Underfloor duct flush open 250mm BKB250851

Tehalit - BKB250851 - Parapet duct UT - Underfloor duct flush open 250mm BKB250851
Photo source: fig. possibly similar
Photo source: fig. possibly similar
BKB250851 4012740846509 EAN/GTIN DE 23692311 WEEE

Our best price
22,657.39₹ excl. VAT
26,973.31₹ (-16% RRP***)
(For 2 Metre) plus shipping bulky item

16-17 days* (IND)

x 2 Metre
Add to wish list
Safety and hazard information
Please note that electrotechnical work may only be carried out by qualified electricians or under their guidance and supervision. Observe any deviating country-specific electrical installation standards and regulations and seek advice from a local electrician.In addition, observe more current safety instructions and regulations for the products on the manufacturer's side or the product descriptions and installation instructions on the manufacturer's side.

Devices with a connected load of > 380V/400V require a heavy current connection and may only be connected by an approved electrical company. Devices with a power rating > 12kW require the approval of your grid operator (Germany, other countries may differ).
read more
show less
Sill duct UT BKB250851 width 250mm, length 2000mm, min. screed height 96mm, assembly opening... more
Parapet duct UT - Underfloor duct flush open 250mm BKB250851 – Tehalit – 4012740846509: Sill duct UT BKB250851 width 250mm, length 2000mm, min. screed height 96mm, assembly opening without, floor care dry, floor pan, lower part with assembly cover sheet steel for BKB 250x85mm length 2m. Electrical installation duct system for installation flush with the screed for rooms with dry-cleaned floors. The 2 m duct system consists of a floor pan and 2 system supports that serve to support the upper parts, a 2 m floor stop rail arranged on the room side that can be adjusted up to a floor covering height of 25 mm and 2 assembly covers that protect the system from damage and dirt during the construction phase. The upper part with the basic profile is grounded using attached earth lugs. The duct system is to be installed horizontally on the unfinished floor and aligned to the screed height using leveling screws, adjustment range min. 96 mm max. 210 mm. The installation must be carried out before the screed is laid.
... more
Width 250 mm
Length 2000 mm
Minimum screed height 96 mm
Leveling 96..254 mm
Lid fastening latching no
Mounting hole without
Cover assembly opening no
With partition yes
Max. Number of moves 2
Bulkhead mounting other
Floor care dry
Floor pan yes
Material of side wall / floor pan Steel
Surface side wall / floor pan galvanized

Rate item

(0 reviews)
Read, write and discuss reviews... more
Customer review for "Parapet duct UT - Underfloor duct flush open 250mm BKB250851"
Write a review
Evaluations will be activated after verification.
Please enter these characters in the following text field.

The fields marked with * are required.